Saudary Shushti

SHYAM VILLA
December 17, 2020

View Our Project Details



  • Structure  
  • Composite structure with adequate R.C.C work.

  • Wall Finish
  • Internal single coat mala plaster with putty finish and external wall double coat sandfase plaster with external paints.

  • Flooring
  • Vitrified tiles in G.F. & F.F.

  • Kitchen
  • Granite platform with S.S. sink. Lintel level dedo on platform.

  • Toilet
  • All toilets concealed plumbing point. Lintel level glazed tiles dedo. Good quality CP fittings.

  • Door / Window
  • Wooden door frame with enamel painted flush door shutters, attractive main door with brass fitting. Full glazing aluminum powder coated window.

  • Electrification
  • Single phase concealed copper ISI wiring.

  • Plumbing
  • Over head water tank connected with all bathrooms with branded fittings and cold & hot water pipe.

  • We do not make a internal or external changes in master plan or any unit plan which would be affecting the elevation .
  • Any Changes made without prior permission of developer will be punishable.
  • Full Payment shall be made before the possession in given.
  • Vastu-Puja etc. shall be performed after the full payment made.
  • Panchayat Taxes shall be borne by the member from over date of completion.
  • Developers reserve the right to change the plan if required.
  • Additional Documentation change such as stamp duty/registration GEB connections/ GST or any Legal Documents( as per Bylaw's Jantri Revenue Department) and other Relative expenditure is to be borne by the purchaser.
  • The broucher and any other material are just to give the idea in general and shall not be treated as legal document.
  • In case of cancellation of the booking in any reason 10% of the cost of the weekend home will be deducted and the balance aount shall be refunded after rebooking of the same weekend home.