Sarjan Vatika

SHYAM VILLA
December 17, 2020
Sarjan 21
May 1, 2014

View Our Project Details



  • Structure  
  • Composite structure with adequate R.C.C work.

  • Wall Finish
  • Internal single coat mala plaster with putty finish and external wall double coat sandfase plaster with external paints.

  • Flooring
  • Vitrified tiles in G.F. & F.F.

  • Kitchen
  • Granite platform with S.S. sink. Lintel level dedo on platform.

  • Toilet
  • All toilets concealed plumbing point. Lintel level glazed tiles dedo. Good quality CP fittings.

  • Door / Window
  • Wooden door frame with enamel painted flush door shutters, attractive main door with brass fitting. Full glazing aluminum powder coated window.

  • Electrification
  • Single phase concealed copper ISI wiring.

  • Plumbing
  • Over head water tank connected with all bathrooms with branded fittings and cold & hot water pipe.

  • Only Internal Changes shall be allowed with prior permission and shall be changed extra.
  • Stamp duty, Registration Fees, GEB Charges, GSPC Charges, Legal Charges, Authority's Charges and Services Tax and Other present / Future Govt. Changes Shall be born by purchaser.
  • Maintenance Deposit for common facilities shall be paid at the time of possession.
  • Irregular payment shall cause cancellation of booking.
  • In case at cancellation of booking the booking amount will be returned after the resale of the unit.
  • Possession will not be given for religious / temporary ceremony untill 100% payment is settled.
  • In case of any dispute, it will be resolved by mutual discussion & understanding or either the matter will be at Nadiad jurisdiction only.